Multiple Planning Integration
DeuSmart multi-planning integrated management platform provides a strong technical support to implement “Multi-planning Integration” strategy. It is aimed to improve government work efficiency and organize different spatial resources in different departments for massive storage and continuous update.
Content
Its aim is to assist the national economic development planning, urban and rural planning, land use planning, environmental protection planning and other planning work, through using the existing data from development and Reform Commission, Planning Bureau, Land Bureau, Environmental Protection Agency and other departments, the differences and contradictions in the planning is able to be detected. Therefore, it enables information sharing and improves the efficiency of administrative examination and approval.
Function of The Platform
1. Regulations and Standards establishment
Regulations and standards are vital to the “Multi-planning Integration” construction. The Multi-planning integration platform is related to many contents, which makes it necessary to follow the regulations of the field and laws in China. According to the specific needs in each project, standards should be made for future construction and operation.
2. Regulatory planning statistic
According to the regulatory planning, count the land coverage by types and generate statistical report and diagram.
3. Homeland statistic
According to related information, count the approved land area by approval date.
4. Planning contradiction detection
Two-planning contradiction detection and three-planning contradiction detection.
5. Limit line management
Detect whether the loaded land is within the “eco limit line”, “limit line of urban expansion”, “Basic farm land limit line”, “industrial area limit line”.
6. Ntelligent selection on project sites
Through analyzing the land type and area, it is able to select sites for the project. Also, with easy calling of the 3D planning system and present it in the 3D view, fast modelling and dynamic adjustment on the model is able to be realized.
7. Lanning decision analysis
3D auxiliary decision analysis, education facility analysis, transportation analysis, greening rate analysis.
8. Arallel approval
The original “passive approval” is transformed into “active pushing”. After applicants sent the materials to the municipal service center, the center will deliver them to the “Multi-planning integration” platform. Different departments will accept the materials on the platform. After approval, the service center will deliver the results to applicants.
Achievements presentation
The final achievements of multi-planning integration is a technical report with five drawings and a data center. The five drawings include land utilization overall planning drawing, regulatory detailed planning drawing, two-planning construction land difference drawing, industrial park and construction layout drawing and “Multi-planning integration”drawing.